HomePage

Objectives

The Team

Programme

Surveys

Reports

Newsletters

 MULTI-MODAL TRANSPORT STUDY

 A453 Nottingham to M1 Junction 24

 Banner Logo - CarsBanner Logo - Train Banner Logo - Cycle

 

 

Multi-modal Transport Study Working Papers

This is the A453 Multi-modal study working papers page. All working papers that are produced during the course of this study will be published in Adobe Acrobat format on this page. 

If you haven't already got your free Acrobat Reader simply click on the icon below the table to download it from the Adobe website.

 

PDF Versions

File Size

Download time

Published

Working Paper No 1 (Consultation - Inception Open days at Clifton & Kegworth)

76KB 23 sec. at 28.8 Kbps

October 2000

Working Paper No 2 (Consultation - Inception Workshop and Open Days - Postal Feedback) 

23KB 7 sec. at 28.8 Kbps

October 2000

Working Paper No 3 (Consultation - Inspection Workshop with Nottingham City Transportation Group)

20KB 6 sec. at 28.8 Kbps

 October 2000

Working Paper No 4 (Consultation - Inception Summary)

55KB 17 sec. at 28.8 Kbps October 2000

Working Paper No 5 (Surveys - Home Travel Survey - Response and Implications - An Initial Assessment)

78KB 24 sec. at 28.8 Kbps

November 2000

Working Paper No 5 (Appendix A)

779KB 4 min. at 28.8 Kbps  November 2000

Working Paper No 5 (Figure 1)

112KB 35 sec. at 28.8 Kbps November 2000

Working Paper No 5 (Figure 2)

47KB 14 sec. at 28.8 Kbps November 2000

Working Paper No 6 (Strategy - Project Management Group Seminar No1)

35KB 10 sec. at 28.8 Kbps October 2000

Working Paper No 6 (Appendix B)

65KB 20 sec. at 28.8 Kbps October 2000

Working Paper No 6 (Appendix C Part 1)

504KB 3 min. at 28.8 Kbps  October 2000

Working Paper No 6 (Appendix C Part 2)

266KB 2 min. at 28.8 Kbps  October 2000

Working Paper No 6 (Appendix C Part 3)

37KB 11 sec. at 28.8 Kbps October 2000

Working Paper No 6 (Appendix C Part 4)

471KB 3  min. at 28.8 Kbps October 2000

Working Paper No 6 (Appendix C Part 5)

296KB 2  min. at 28.8 Kbps  October 2000

Working Paper No 7 (Strategy Development  - Status Report) 

119KB

37 sec. at 28.8 Kbps

July 2001

Working Paper No 8 (Planning Date for Future Years Interim Report)

510KB 3 min. at 28.8 Kbps February 2001

Working Paper No 9 - Superseded by Later Papers

- - -

Working Paper No 10 - Not Used

- - -

Working Paper No 11 (Strategy - Summary)

43KB 13 sec. at 28.8 Kbps April 2001

Working Paper No 12 - Not Issued

- - -

Working Paper No 13 (Opportunities for Improving the Visual Presentation of Scheme Options)

35KB 10 sec. at 28.8 Kbps April 2001

Working Paper No 14 (Specification of the Do Minimum Networks)

92KB 28 sec. at 28.8 Kbps July 2001

Working Paper No 15 (Revisions to Base Year Planning Data)

40KB 12 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 1 part A)

14KB 4 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 1 part B)

10KB 3 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 1 part C)

9KB 2 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 2)

10KB 3 sec. at 28.8 Kbps  June 2001

Working Paper No 15 (Appendix 3)

11KB  3 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 4)

11KB 3 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 5 part A)

16KB 5 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 5 part B)

11KB 3 sec. at 28.8 Kbps June 2001

Working Paper No 15 (Appendix 5 part C)

14KB 4 sec. at 28.8 Kbps  June 2001

Working Paper No 16 (Possible Freight Options)

23Kb  7 sec. at 28.8 Kbps August 2002

Working Paper No 17 (Initial Options for Testing)

169Kb 52 sec. at 28.8 Kbps August 2002

Working Paper No 18 (Summary Approach to 2011 Planning Data Derivation)

35Kb 10 sec. at 28.8 Kbps August 2002

Working Paper No 19 (Consultation - Freight Industry Seminar)

6Kb 1 sec. at 28.8 Kbps August 2002

Working Paper No 20 (Consultation - Environmental Groups Seminar)

34Kb 10 sec. at 28.8 Kbps August 2002

Working Paper No 21 (Freight Industry Interviews - PMG Only)

- - -

Working Paper No 22 (Appraisal Methodology - A Summary)

230Kb 1 min. at 28.8 Kbps August 2002

Working Paper No 23 (Planning Data 2001) - Not Issued

- - -

Working Paper No 24 (Report on Wider Reference Group 26-09-01)

106Kb 33 sec. at 28.8 Kbps August 2002

Working Paper No 25 (Schemes for Suspension, Amalgamation or Rejection)

75Kb 23 sec. at 28.8 Kbps August 2002

Working Paper No 26 (A Strategy for Freight)

101Kb 31 sec. at 28.8 Kbps August 2002

Working Paper No 27 (An Assessment of A453 Bypass Corridors)

70Kb 21 sec. at 28.8 Kbps  August 2002

Working Paper No 28 (A Strategy for Walking and Cycling)

86Kb  26 sec. at 28.8 Kbps August 2002

Working Paper No 29 (Analysis of A453 Accidents) - Incorporated into Working Paper 35

- - -

Working Paper No 30 (Land Use Planning Implications)

99Kb 30 sec. at 28.8 Kbps August 2002

Working Paper No 31 (Operational Assessment of Preferred Option - Clifton)

160Kb 50 sec. at 28.8 Kbps September 2002

Working Paper No 32 (Operational Assessment of M1 Junctions 23A and 24)

144Kb 45 sec. at 28.8 Kbps September 2002

Working Paper No 33 (An Overview of Public Transport)

74Kb 23 sec. at 28.8 Kbps September 2002

Working Paper No 34 (Public Consultation)

87Kb 27 sec. at 28.8 Kbps September 2002

Working Paper No 35 (S2 vs D2 Carriageway between M1 Junction 24 and Clifton)

52Kb 16 sec. at 28.8 Kbps  August 2002

Working Paper No 36 (Clifton Single 4 Lane Scheme)

20Kb 6 sec. at 28.8 Kbps  August 2002

Please note the size of these reports. They are large and may take several minutes to download.

Get Acrobat Reader


GOEM logo Pell Frischmann Logo NERA Logo

Capital Risk logo

Gillespies logo      PTV logo  

 


The materials on this website are provided for information purposes only.
Ó Copyright Pell Frischmann. All rights reserved. 

Last Modified 03-08-2000